Tradies Gymea

Tradies Gymea involved a lot of electrical from over 500m of LED Strip controlled by Dynalite to the cabling of a whole new gaming floor.

The new gaming floor is lit by over 40,000 LED’s in an architectural ceiling pattern, this is controlled by Dynalite and interfaced to the Clubs Major Gaming Jackpot which triggers a light show when the Jackpot goes off. The LED lighting was supplied by WED Group along with the dimming and Jackpot design.

The new gaming floor sits 300mm above the slab on raised computer flooring allowing for clean out of site cabling with no ceiling poles giving the gaming floor a much better look.

On the lower lever a new reception, coffee shop and day spa was built all lit by specialty feature lights and efficient LED downlights.