Project Description
Working direct with club WED Group undertook a full design and construct concept on a long term solution for their Gaming Room Electrical & Communications Infrastructure.
The scope of works included:
- Custom Built Comms room with racks and access floor.
- New gaming distribution board with UPS back-up for the comms room.
- Dynalite control to switch the poker machines to suit the clubs operating schedule.
- All new communications cabling to gaming banks.
- All new switched & un-switched power to gaming banks.
- HD over IP video switching system for link graphics.
Project Details
Client:
Rooty Hill RSL
Architect:
Builder:
Completed:
2019
Total Cost:
$650K